- ESSnuSB. MS13. Review of 3rd year milestones, deliverables & costs (38) on 28/02/2021 12:30
- ESSnuSB. MS14. Linac modifications (M40) on 30/04/2021 08:00
- ESSnuSB. MS15. Full simulation of the accumulation ring (M40) on 30/04/2021 09:00
- ESSnuSB. MS16. Choice of optimal baseline scenario (M40) on 30/04/2021 10:00
- ESSnuSB. D1.3 Performance, cost and safety evaluation of the facility (M42) on 30/06/2021 08:00
- ESSnuSB. D5.4 Design of the far detector and its performance evaluation (M42) on 30/06/2021 09:00
- ESSnuSB. D6.4 Final physics performance (M42) on 30/06/2021 10:00
- ESSnuSB. MS17. Final design of target station (M42) on 30/06/2021 11:00
- ESSnuSB. D2.4 Conceptual design of the ESS RF power upgrade (M45) on 30/09/2021 08:00
- ESSnuSB. D4.4 Design of the target station (M45) on 30/09/2021 09:00
- ESSnuSB. MS18. Cost and performance evaluation complete (M48) on 31/12/2021 08:00